featured insights

Stay tuned for what you need to know.

Thailand Land Bridge: The Trillion-Baht Corridor Stopped Post-Review

Thailand Land Bridge: The Trillion-Baht Corridor Stopped Post-Review

A rate of return falling from 8 per cent to 4.8. A net present value moving from positive 600 billion baht to negative 10,287 million. Two feasibility studies that disagreed for years, and a committee that finally chose between them. Thailand has stopped its trillion-baht Land Bridge and named a 110 km railway in its place. A rate of return falling from 8 per cent to 4.8. A net present value moving from positive 600 billion baht to negative 10,287 million. Two feasibility studies that disagreed for years, and a committee that finally chose between them. Thailand has stopped its trillion-baht Land Bridge and named a 110 km railway in its place. MCG reads the decision past the announcement: whose arithmetic won, what the replacement has not been through, and why it is being built to a gauge that cannot serve its own purpose.

Read More
Thailand Political Risk: Will the Hat Yai Floods Trigger a December Dissolution?
Maverick Consulting Group Maverick Consulting Group

Thailand Political Risk: Will the Hat Yai Floods Trigger a December Dissolution?

The Hat Yai floods have stripped the coalition of its competency narrative. With the Article 151 constitutional deadline looming, our analysis identifies a "Death Race" scenario that points toward a House Dissolution by 12 December—triggering a potential governance vacuum and fiscal cliff in Q1 2026.

Cover Photo Credit: Khaosod English

Read More